Processing Several Technological Problems That Should be Paid Attention to 4 m More Rope Pulley

Qi ZHANG,Bao-hong ZHANG
DOI: https://doi.org/10.13436/j.mkjx.201509061
2015-01-01
Abstract:Around the coal mine in our country in the past, most of the introduction of Germany XIGEMA company 4 m steel structure line, the usage of pulley, to make its use localization, digestion, absorption, Germany XIGEMA company's technology, reduce the cost, in further study of XIGEMA company 4 m pulley drawing, on the basis of established relatively perfect production process, several problems that should be paid attention to production is introduced. At present domestic the pulley, safe and reliable operation in our country, several large shaft.