Risk analysis and control for construction of metro connected aisle in complex strata with watery sandy stratum

Xiang-xi FAN,Shu-ying WANG,Sheng PI,Jun-sheng YANG
DOI: https://doi.org/10.11731/j.issn.1673-193x.2015.09.023
2015-01-01
Abstract:Relying on the engineering of metro connected aisle in complex strata with watery sandy stratum of Zhong~Zi section in Nanchang rail transit line 1 , the risk of construction was analyzed for the watery sandy stratum re-vealed during the construction process.A three-dimensional numerical analysis model was built.The strata reac-tions after the construction of connected aisle under watery conditions by two treatment measures, one is stratum pre-reinforcement, and the other is stratum pre-reinforcement combined with precipitation by precipitation wells, were discussed respectively, and the technical treatment schemes for complex strata with watery sandy stratum were proposed.The practical application effect of the scheme was good, and the risk in construction of connected aisle was controlled effectively.It can provide reference for similar strata conditions.
What problem does this paper attempt to address?