Application research of genetic algorithm in construction resource optimization and progress impact prediction
Chengyue Zhang,Ronggui Liu,Xiaoqian Zhang
DOI: https://doi.org/10.54254/2755-2721/67/20240485
2024-08-14
Abstract:With the acceleration of urbanization and the continuous advancement of infrastructure construction, the optimization of construction resources and the prediction of progress impact have become important issues in the field of engineering construction. This is one of the important contents in engineering project management, aiming to ensure the reasonable satisfaction of resource demand during construction and maximize the utilization of resources. The types and quantities of resources required are vast, making scheduling and allocation difficult, with waste being a common phenomenon. In the complex and ever-changing construction environment, it is difficult to achieve the maximization of resource utilization and precise control of progress. The accuracy of progress prediction directly affects the allocation of construction resources and cost control. Most construction enterprises still use traditional, experience-based estimation methods for progress prediction, which are easily influenced by various factors. At the same time, due to the numerous uncertainties in the construction process, progress prediction faces great difficulties. This requires the use of artificial intelligence, big data analysis, etc., to improve the accuracy of prediction. At the same time, strengthening project management and team coordination capabilities to ensure the smooth progress of construction work. This paper mainly utilizes principal component analysis and qualitative and quantitative analysis to experimentally analyze genetic algorithms, machine learning models, regression analysis, time series analysis, and construction resource allocation. The experimental results show that the prediction results of machine learning models and regression analysis are 0.54, which is 0.01 higher than the actual results.