Pilot-Scale Study on the Impact of Ozone Dosage on O3/BAC Process for Advanced Treatment Reservoir Water

邬晓东,周北海,袁蓉芳,张磊,顾军农
DOI: https://doi.org/10.13198/j.issn.1001-6929.2014.04.12
2014-01-01
Abstract:As an important parameter of O3/BAC,ozone dosage directly affects the purification effect of water and operation costs. The optimal pre-ozone dosage and optimal post-ozone dosage were determined based on the removal efficiency of general pollution indices(e. g.,CODMn,UV254and turbidity) in ozone-activated carbon,which are pre-ozone/BAC(process Ⅰ) and post-ozone/BAC(process Ⅱ). The study also compared the removal efficiency of organic pollutants,before and after ozonation,in the process Ⅰ and process Ⅱ. The results showed that the optimal pre-ozone dosage was 0. 78 mg/L in process Ⅰ,while the removal efficiencies of CODMnand UV254at the optimal pre-ozone dosage were 28. 9%,43. 7% respectively higher than those at zero; the optimal post-ozone dosage was 1. 20mg/L in process Ⅱ,and the removal efficiencies of CODMnand UV254at the optimal post-ozone dosage were 44. 8% and 73. 7% respectively higher than those at zero. It could be seen that,when O3/BAC process was used for Danjiangkou Reservoir water advanced treatment,it could effectively remove the organics and comprehensively improve the water quality in the optimal ozone dosage. Moreover,the treatment capacity of process Ⅱ was better than that of process Ⅰ after the water treatment for the Danjiangkou Reservoir.
What problem does this paper attempt to address?