Removal of Nitrogen and Phosphorus from Precipitation Runoff of Dianchi Catchment Using Natural Zeolite

zhang xi,wu weizhong,wen donghui,li wenqi
DOI: https://doi.org/10.3321/j.issn:1672-2043.2003.02.014
2003-01-01
Abstract:The characteristics of pollutants in the precipitation runoff discharging to Dianchi Lake and the removal of pollutants by natural zeolite were studied.The fo llowing results were obtained:the t ime for need removal over 50%of ammon ia nitrogen and total phosphorus remained was 17hours whi le the times for over 50%of removal ra tio of nitrite nitrogen and nitrate n itrogen remained were5and 8hours,respectively.Within t he same removal period,removal ratio of ammonia nitrogen decreased with either runoff velocity or increasing times of using zeolite.
What problem does this paper attempt to address?