MECHANICAL CHARACTERISTICS OF DOMESOF LARGE SURGE TANK AT TAILRACE DURING CONSTRUCTION

WANG Kezhong,YIN Honglei,LI Zhongkui,MAN Zhiwei
DOI: https://doi.org/10.13722/j.cnki.jrme.2014.07.011
2014-01-01
Abstract:The surge tank at tailrace of Jinping I hydropower station is composed of two vertical cylindrical wells of large-diameter at the location of high stress and complex geological configurations with two large scale faults and multiple sets of joints. It was difficult to cavern out the domes and setup supporting structures at the top of cylindrical wells. Engineering practice and theoretical research show that the methods of excavation and the parameters of supporting are the key factors influencing the stress distribution and deformation at the crest of the dome of the tailrace surge tank. Lamprophyre veins and fault f14 were found to exist above the dome of tailrace surge tank #1 through in-situ investigations. The deformation and failure mechanisms of surrounding rock of the tailrace surge tank are studied through mechanical analysis,in-situ monitoring and 3D numerical simulation. The deformational and mechanical characteristics of the dome rocks during excavation process were studied. Some advices on the excavation and support for the tailrace surge tank are thus presented as the technical supports for its excavation and design of the support.
What problem does this paper attempt to address?