A PTAS FOR MINIMIZING TOTAL COMPLETION TIME OF BOUNDED BATCH SCHEDULING

Xiaotie Deng,Haodi Feng,Guojun Li,Guizhen Liu
DOI: https://doi.org/10.1142/s0129054102001473
2002-01-01
Abstract:We consider a batch processing system {p i : i = 1, 2,…,n} where p i is the processing time of job i, and up to B jobs can be processed together such that the handling time of a batch is the longest processing time among jobs in the batch. The number of job types m is not fixed and all the jobs are released at the same time. Jobs are executed non-preemptively. Our objective is to assign jobs to batches and sequence the batches so as to minimize the total completion time. The best previously known result is a 2–approximation algorithm. In this paper, we establish the first polynomial time approximation scheme (PTAS) for the problem.
What problem does this paper attempt to address?