Flexible Job-Shop Scheduling Problem with Maintenance Activities Considering Energy Consumption

Wen Jia Song,Chao Yong Zhang,Wen,Xin Yu Shao
DOI: https://doi.org/10.4028/www.scientific.net/amm.521.707
2014-01-01
Applied Mechanics and Materials
Abstract:With the developing of industry, the topic of energy-saving is attracting more and more attentions. However, the attentions have focused primarily on the design activities of the firm. The planning/scheduling activities of manufacturing are neglected. In this paper, a mathematical model, which considers the energy consumption and preventive maintenance of equipment in the flexible job shop, is established, three objectives, such as the minimization of maximum completion time, the minimization of total production energy costs and the minimization of total energy costs of maintenance that are quantized by electricity, are taken into account. The algorithm of NSGA-II is presented to solve the optimization model, and experimental results validate the effectiveness of the proposed approach.
What problem does this paper attempt to address?