Multi-objective flexible Job-Shop scheduling based on energy-consumption mechanism

Zheren Bao,Hua Xu
DOI: https://doi.org/10.3969/j.issn.1001-3695.2017.12.022
2017-01-01
Abstract:By considering the scheduling objectives such as energy consumption,makespan and processing cost,this paper built a multi-objective flexible Job-Shop scheduling model.According to the characteristics of the model,it proposed an improved discrete bat algorithm to solve it.The algorithm used a single integer encoding strategy in order to express the relationship effectively between the process and the particle population.It designed a particle mutation operation with memory ability to avoid the premature convergence and low precision of the particles.By introducing a linear decrease strategy into the bat algorithm,it kept the balance between the global and the local researching abilities.Finally,the experimental data shows that the improved algorithm has good performance in solving multi-objective flexible Job-Shop scheduling problem,and it is an effective scheduling algorithm.
What problem does this paper attempt to address?