Real-Time Model of a Large-scale Water Distribution System

W. P. Cheng,T. C. Yu,G. Xu
DOI: https://doi.org/10.1016/j.proeng.2014.11.212
2014-01-01
Procedia Engineering
Abstract:This paper presents a real-time WDS hydraulic model combining with field measurements provided by supervisory control and data acquisition systems (SCADA). The system is composed of three parts, namely SCADA, state estimation server and client terminal. For the real-time demand estimation, a weighted least-squares scheme based recursive state estimator and local linear matrix transform algorithm are applied. The WDS model system is applied in Guangzhou city, which is one of the largest cities in China, and proves that the proposed nodal demand correction algorithms are effective for real-time WDS model.
What problem does this paper attempt to address?