Challenges Of The Atlas Monte Carlo Production During Run 1 And Beyond

J. Chapman,W. Ehrenfeld,J. E. Garcia Navarro,C. Gwenlan,S. Mehlhase,V. Tsulaia,J. Zhong
DOI: https://doi.org/10.1088/1742-6596/513/3/032029
2014-01-01
Abstract:In this paper we will review the ATLAS Monte Carlo production setup including the different production steps involved in full and fast detector simulation. A report on the Monte Carlo production campaigns during Run 1 and Long Shutdown 1 will be presented, including details on various performance aspects. Important improvements in the work flow and software will be highlighted.Besides standard Monte Carlo production for data analyses at 7 and 8 TeV, the production accommodates various specialised activities. These range from extended Monte Carlo validation, Geant4 validation, pile-up simulation using zero bias data and production for various upgrade studies. The challenges of these activities will be discussed.
What problem does this paper attempt to address?