Variable Time Windows-Based Three-Phase Combined Algorithm for On-Line Batch Processing Machine Scheduling with Limited Waiting Time Constraints

dongwei yang,wenyou jia,zhibin jiang,you li
DOI: https://doi.org/10.1007/978-981-4451-98-7_67
2013-01-01
Abstract:In this paper, a variable time windows-based three-phase combined algorithm is proposed to address the scheduling problem of on-line batch processing machine for minimizing total tardiness with limited waiting time constraints and dynamic arrivals in the semiconductor wafer fabrication system (SWFS). This problem is known to be NP-hard. In the first phase, the on-line information of scheduling parameters is preserved and sent. In the second phase, the computational results of reforming and sequencing are obtained. In the third phase, the super-hot batch is loaded. With the rolling horizon control strategy, the three-phase combined algorithm can update solution continually. Each interval of rolling horizon is a time window. The length of each time window is variable. The experiments are implemented on the real-time scheduling simulation platform of SWFS and ILOG CPLEX to demonstrate the effectiveness of our proposed algorithm.
What problem does this paper attempt to address?