Production Scheduling in the Multi-items,Multi-paths, Multi-processes Situation

郑骁庆,邹平
DOI: https://doi.org/10.3969/j.issn.1007-855x.2004.02.036
2004-01-01
Abstract:In the course of the simultaneous optimization of all decision features in a multi-items, multi-paths, multi-processes, scheduling problems widely exist in modern corporations. Methods to solve the problems are offered by dynamic programming and network analysis, which includes three steps: overall plan, single device scheduling and integration. The methods can reduce the cost of the production and improve efficiency, and be applied to parts-making, assembly plants and other companies.
What problem does this paper attempt to address?