Transmission Network Planning Considering Transmission Profit and Social Cost Based on Bi-Level Programming

Hong FAN,Yi-xiong JIN,Hao-zhong CHENG,Jie-tan ZHANG
DOI: https://doi.org/10.3969/j.issn.1674-3415.2011.24.018
2011-01-01
Abstract:Multistage transmission network planning bi-level programming model considering transmission profit and social cost is presented.The upper level programming is to make the investment of transmission network,with the aim of maximum benefit of transmission network.The lower level programming is short term pricing mode based onminimum social cost,using congestion benefit to restrict transmission profit.Transmission serving profits and congestion profits are computed in transmission profits.Power flow following method is used to determine the line carrier degree of generation nodes,and the transmission serving fee is gotten from generation companies to realize the transmission investment cost recovery.Hybrid algorithm which integrates improved niche genetic algorithm with prime-dual interior point method is proposed to solve the above model.The results of 18-bus system and 77-bus system prove that the proposed model and algorithm are valid.
What problem does this paper attempt to address?