Application of dependent-chance bilevel programming in transmission network expansion planning

Hong Fan,Haozhong Cheng,Yonghong Tang,Lin Xu
DOI: https://doi.org/10.3969/j.issn.1006-6047.2013.11.011
2013-01-01
Abstract:A model of transmission network expansion planning based on dependent-chance bilevel programming is proposed. It takes the maximum probability of investment return rate lager than a given value as its objective in its upper level programming. There are two appurtenant objectives in its lower level programming: the maximum social profit in normal operation and the maximum probability of load shedding lower than a given value in N-1 operation. Monte-Carlo method is adopted to simulate the uncertainty of model parameters and the genetic algorithm is used to globally search the optimal solution. The interior point method is used in the lower level programming. A modified 18-bus system is applied to verify the effectiveness of the proposed model and method.
What problem does this paper attempt to address?