Monitor design research on slope stable in Haizhou Open-pit

Qing Yang,Zonglin Wang,Sheng Li,Jun Han
DOI: https://doi.org/10.1109/MACE.2011.5987681
2011-01-01
Abstract:In order to study on open pit slope rock mass deformation and slope stability, analyze the main influence factors of Haizhou Open-pit slope instability, and set up monitoring stations at W1, E8 and E18 section respectively, Using remote monitoring system to detected an unstable slope. Remote monitoring system consists of two parts composition. One is intelligent sensor, collection, transmission systems, The other is smart receiving analysis system. Using remote monitoring system to obtain the monitoring data of instability region, and adopt the MSARMA method to analyze the stress changes of the slope rock mass. The results indicates that aiming at the slope instability region of Haizhou Open-pit conduct monitoring design and construction, find out the best combining spot between economic and security to be monitoring points, it can save large investment for reinforcement and has the advantages automation and real-time. © 2011 IEEE.
What problem does this paper attempt to address?