Abstract:A simulation platform with high flexibility and extensibility for nuclear power plant DCS closed-loop test has been developed. The system modeling for Ling'ao Phase II nuclear power plant has been built. Through an example of pressurizer pressure and water level control system testing under the condition of a 10%FP turbine power step-down, the way of using the platform for closed-loop DCS test and how to locate DCS problems were demonstrated. This test platform has been applied to DCS closed-loop test in Ling'ao Phase II successfully.