Integrated Scheduling Model and Its Optimization for Agile Supply Chain Based on Time Slots

WANG Jian-hua,LI Nan,GUO Hui
IF: 2.034
2011-01-01
Systems Engineering
Abstract:When a market demand appears,the agile supply chain need make the decision of supplier selection and its production and transportation schedule,the decision process is very complex.Based on the representation of time slots,an INLP model is designed to describe the scheduling problem firstly, which takes minimizing the total inventory,production and transportation cost of the supply chain as the objective,and delivering just in time as precondition.Then,in order to solve the INLP model,a Hybrid Genetic Algorithm(HGA) whose chromosomes are made up of the time slot's codes is developed,and a greedy-sequence decoding method,which can achieve certain solution meeting all the time and quantity constraints of the model,is designed to accelerate the process of HGA's convergence and get optimal solution.Finally,a scheduling example verifies the practicality and effectiveness of the algorithm.
What problem does this paper attempt to address?