Creep deformation analysis and optimal construction scheme for Jishixia concrete faced rock-fill dam

张嘎,张建民,王富强,张雷
2010-01-01
Abstract:Settlement and lateral deformation of a CFRD are relatively large due to the creep deformation of rockfill materials at the operation stage,stress and deformation in the face slab are accumulated at this stage,so the safety of a CFRD becomes a crucial issue.On the completion of rockfill construction,a certain period is needed for stabilization of deformation,and a longer stabilization is favorable to dam safety,while the cost would grow correspondingly.In this paper,a three dimensional analysis of creep deformation is conducted for the Jishixia CFRD,focusing on the effect of different stabilization periods.Based on the results an optimal scheme for rock-fill construction is suggested.
What problem does this paper attempt to address?