Fast Start-Up Strategies for Internal Circulation Anaerobic Reactor

WU Jing,HUANG Jiandong,LU Zhengyu,JIANG Jie,SU Wei,ZHANG Zhongliang,ZHOU Hongming
DOI: https://doi.org/10.16511/j.cnki.qhdxxb.2010.03.009
2010-01-01
Abstract:In order to investigate the fast start-up of anaerobic reactor,a mesophilic internal circulation anaerobic reactor with a suspended solid concentration of granular sludge of 25.33 g/L and an initial organic loading of 11 kg/(m3·d) was started up.After 10 days,when the start-up finished,the organic loading reached 13 kg/(m3·d) with a chemical oxygen demand removal of 95%.The first internal circulation formed in the 1st day.The strategy of a high organic loading with a high granular sludge concentration is advantageous for fast start-up when the bio-activity of the granules is good.
What problem does this paper attempt to address?