Blast design and optimization studies based on vibration control for excavation of hydropower stations

Jin Li,Luo Yi,Zhang Fayong,Zhu Qihu
DOI: https://doi.org/10.1109/APPEEC.2009.4918204
2009-01-01
Abstract:It makes a systematic summarization on the key points of controlling blasting vibration for hydro-electric projects, including requirements of controlling vibration and prediction of vibration. Then it provides a set of blast design and optimization method on the basis of controlling blasting vibration. At last a case of blasting design by this method is introduced, which is from the project of Zhexi hydropower station. Results show that ground vibration is controlled effectively by this design method.