Long-term Settlement of Tunnels Across a River Induced by Vehicle Operation

LIU Ming,HUANG Mao-song,LIU Yan-hua
DOI: https://doi.org/10.3321/j.issn:1000-4548.2009.11.010
2009-01-01
Abstract:With rapid development of river tunnel engineering, long-term settlement of soft ground induced by traffic operations has caused high concerns. For the propose of analyzing long-term settlement of saturated soft clay ground under traffic loading, simplified methods based on semi-empirical models for predicting the accumulative deformations of soft clays are usually preferred. A new empirical model is proposed in order to simulate cumulative plastic strain and pore pressure of anisotropically consolidated soft clays based on undrained cyclic triaxial tests, which extends a semi-empirical formulation previously presented by the authors for isotropically consolidated clays. Unlike the previous model, a new formulation is introduced to take effects of initial K_0-consolidated stress state into consideration. Parameters of the empirical model are determined based on undrained cyclic triaxial tests on anisotropically consolidated Shanghai soft clay. Based on the layer-wise summation method, a simplified method is suggested to calculate the long-term settlement of soft ground caused by traffic loading. Analysis for settlement of a typical river tunnel project is presented to demonstrate the new method.
What problem does this paper attempt to address?