Time Series Analysis Of Ground Surface Displacement Induced By Tunnel Excavation

S. W. Qin,J. P. Chen,Y. H. Xiao,J. S. Que
DOI: https://doi.org/10.1201/9780203883204.ch69
2008-01-01
Abstract:To a shallow tunnel, displacement of ground surface is a significant index, which reflects the inner deformation of the tunnel. Monitoring data of the displacement is a time series. By analyzing the acquired displacement data to predict the future displacement, we can understand the situation of the stability of the tunnel surrounding rock mass. Affected by excavation and other uncertain factors, this displacement is an undetermined and dynamic system, and the method of normal stationary time series can't be used to solve this problem. Artificial neural networks is an available tool of nonlinear fitting, with which we can extract the trend term of displacement time series. With BP (Back Propagation) neural networks, the nonstationary displacement time series becomes a stationary series, which could be processed by normal ARMA (Auto Regressive Moving Average) model. Combined with the real-time tracing algorithm, BP-ARMA model is built up, and thus time series analysis of displacement induced by tunnel excavation could be carried out. As a test, this model is used in prediction of the displacement which is caused by excavating a new tunnel in Zhejiang Province. The results of engineering case indicate that it is reliable. This method combines advantages of artificial neural networks and time series, and can be used in practical engineering.
What problem does this paper attempt to address?