Integrated scheduling model for continuous casting-hot rolling based on multi-agents

Jun Zhao,Hongren Zhan,Xiaolin Wang,Guolin She,Wei Wang
DOI: https://doi.org/10.3321/j.issn:0254-3087.2008.07.041
2008-01-01
Abstract:Continuous casting hot rolling process is an important production procedure in steel industry and its production scheduling determines the manufacturing efficiency and economic profits of whole steel enterprise. An integrated continuous casting hot rolling production scheduling model is established in this paper to solve the production scheduling problem in continuous casting hot rolling process. The model is composed of six agents. The functions and tasks of the each agent are illustrated, and the cooperation relationships between the six agents are demonstrated. Finally, the simulation experiment with real production data shows that the proposed model effectively increases the hot charge ratio of the rolling process and decreases the energy consumption.
What problem does this paper attempt to address?