A method based on MTO-MTS for the order planning of the steel plant

Tao ZHANG,Hai-gang CHENG,Yue-jie ZHANG,Jian-hai SONG
DOI: https://doi.org/10.3321/j.issn:1000-6788.2008.11.014
2008-01-01
Abstract:Based on MTO-MTS ideas for the steel-iron enterprise, this paper constructs an integer programming model for order planning, which considers inventory matching and production planning simultaneously. The objective is to minimize the total cost including earliness-tardiness penalty, later delivery penalty in delivery time window, production cost, inventory matching cost, order cancellation penalty. According to the characteristics of the model, a PSO algorithm with heuristic repaired strategy for infeasible solutions is designed. Using several sets of practical data as instances, this paper analyzes the influence on the results brought by the different parameters in the algorithm and compares the solutions obtained by this method with those obtained by the method considering inventory matching and production planning in different phases. The numerical analysis shows that the model and the algorithm are valid.
What problem does this paper attempt to address?