Abstract:The principle and process of parallel seismic method for the integrity of cemented soil columns were introduced.A 3D finite element model for the pile-soil system was established for impulse responses.Under saturated soil or unsaturated soil condition,some vibrating velocity-time histories at different depths in the parallel hole were obtained with the numerical model.It is shown that the length and 1D P-wave velocity of a cemented soil column are easy to determine from the features of the mentioned velocity-time histories.The effect of 3D P-wave propagation through the saturated soil and the defect of the cemented-soil column on the velocity-time histories in the parallel hole were also investigated.