RESEARCH ON METHOD OF NUMERICAL SIMULATION OF PRESTRESSED ANCHOR CABLE IN SLOPE

LI Ning,ZHANG Peng,YU Chong
DOI: https://doi.org/10.3321/j.issn:1000-6915.2007.02.005
2007-01-01
Abstract:Prestressed anchor cable have been widely used as a main reinforcement method in geotechnical engineering,and its effective reinforcement capabilities have been validated by many project cases.However,for the existing method of numerical simulation of prestressed anchor cable in slope has some disadvantages,the result of numerical simulation in FEM isn′t in accord with practical one.This paper tries to discuss these disadvantages about the existing method of numerical simulation of prestressed anchor cable in slope and put forward a series of measures.Then,the authors suggest a new method of numerical simulation of prestressed anchor cable in slope which will simulate the whole process in construction and operation period.At last,the abutment slope in Jinping Hydroelectrical Project illustrates the difference between the existing method and the proposed method.
What problem does this paper attempt to address?