APPLICATION OF VERHULST MODEL TO PREDICTION OF ROADBED SETTLEMENT ON SOFT SOIL

CHANG Fangqiang,TU Fan,JIAYonggang
DOI: https://doi.org/10.3321/j.issn:1000-6915.2007.z1.080
2007-01-01
Abstract:After analyzing the characters of roadbed settlement and Verhulst model,it is found that the observed curve of roadbed settlement with time is quite similar with that calculated from Verhulst model.The prediction of settlement of Anji roadbed on soil base in Quanzhou City by using Verhulst model gradually approaches to the observed values although there are some differences between predicted values and observed ones during construction period.Therefore,Verhulst model can be used to predict the ultimate settlement.This model has good adaptability because the influence of randomicity of irregular original data can be weakened efficiently.The difference between predicted values and observed ones,the influence of observation period on predicted values and the calculation of ultimate settlement are also discussed.The more precise predicted values of ultimate settlement need values observed for at least four to six months for soft roadbed.The ultimate settlement predicted by observed values can be modified by two coefficients,i.e.the ratio between observed values and predicted ones and the influence coefficient of observation period.These two coefficients can be also used in the similar projects.
What problem does this paper attempt to address?