Stability behavior and new construction process for a five-span CFST arch bridge

Wang Yuyin,Zhang Sumei,Liu Changyong,Geng Yue
2007-01-01
Abstract:This paper developed a finite element model to simulate and analyze the mechanical behavior of a five-span tied rigid-frame concrete filled steel tubular arch bridge with ANSYS. The stability behavior of the main span was predicted by means of four methods and the differences of the predicted results were compared and discussed. Some parameters were investigated on the bridge's stability and the dominating factors among them were finally outlined. In addition, it is quite time-consuming to build such a continuous CFST arch bridge in the traditional construction method, so a new construction scheme was brought forward in this paper in order to raise the constructional efficiency. The analysis results proved that with the new construction scheme, all the stress, deformation and displacement can meet the Chinese design requirements. Thus, this new construction scheme was reasonable and reliable. © 2007 Taylor & Francis Group.
What problem does this paper attempt to address?