Risk Analysis Of Soil Transition In Tunnel Works

Qunfang Hu, ,H. W. Huang
DOI: https://doi.org/10.1201/noe0415408073.ch34
2007-01-01
Abstract:Recent years the demands for systematic risk analysis of soil transition for tunnel works are more and more increasing to minimize the construction accidents. The probabilistic geologic prediction model based on Markov process is being established to characterize the probabilistic form of ground uncertainty. This paper studied how to modify 1D (one dimension) Markov process, and then improved to establish a new method of the conditional Markov Process, which can uses all available ground class information. For analyzing the spatial soil transition, the 2D (two dimension) conditional Markov process is also proposed and discussed. The modified 2D conditional Markov process can predict the soil transition and get the probabilistic risk index by Monte Carlo simulation. Finally a case study of Shanghai Yangtze River Tunnel, the biggest diameter and longer shield tunnel now in the world, showed that the predicted data using the proposed method has very good agreements with the real borehole data.
What problem does this paper attempt to address?