Model and Algorithm for Hot Rolling Lot Planning

NING Shu-shi,WANG Wei
DOI: https://doi.org/10.3969/j.issn.1004-731x.2007.03.058
2007-01-01
Abstract:To the hot rolling lot planning problem arose in production scheduling of iron and steel enterprises, a mathematical model was proposed with the aims of promoting average rolling length of rolling turn and increasing hot charge rate. These two objectives are not with the same priority in practice. A two-stage variable neighborhood search algorithm was designed to solve the problem, and the algorithm solves the problem by optimizing the average rolling length first and optimizing hot charge rate secondly. Simulation using practical data shows the effectiveness of the proposed model and algorithm.
What problem does this paper attempt to address?