MATHEMATICAL MODEL AND ALGORITHM FOR SCHEDULING OF STEEL COILS ANNEALING

董杰方,刘志新,谢金星,邢文训
DOI: https://doi.org/10.3321/j.issn:0449-749x.2001.12.018
2001-01-01
Abstract:The scheduling of bell type furnace operation in annealing shop of cold rolling plant of an iron and steel corporation is discussed Assuming it as the no wait hybrid flow shop scheduling a mathematical model and greedy algorithm has been established The results of numerical experiments show that the model is reasonable and the algorithm is effective
What problem does this paper attempt to address?