Performance of a Deep Excavation Constructed Using the United Method: Bottom-Up Method in the Main Building Part and Top-Down Method in the Annex Building Part

g e di,j h wang,z h xu,w d wang
DOI: https://doi.org/10.1061/40867(199)48
2012-01-01
Abstract:This paper presents a case history of a deep excavation for a building foundation in soft deposit in Shanghai. This deep excavation is of particular interest because it was constructed using the united methods: bottom-up method in the main building part and top-down method in the annex building part. The excavated area is about 7000 square meters. The depth of excavation in the main building part is 13.5 m and in the annex building part is 12.0 m. The excavation was retained by diaphragm wall with a thickness of 0.8 m. Three levels of reinforced concrete bracing structures were installed to support the wall at the part which was constructed by bottom-up method. Wall displacement, axial forces of the struts, and displacements of the props were monitored during the excavation. At last, field monitored results were analyzed in details.
What problem does this paper attempt to address?