Risk Assessment Method Studies for the Weaponry and Equipment Project Based on Influence Diagram

Jin-lin LI,Nan-nan XU
DOI: https://doi.org/10.3969/j.issn.1001-0645.2006.z1.026
2006-01-01
Abstract:In order to describe the level that different kinds of risk factors in weaponry project influenced the system risk value accurately, various risk factors in the arms and equipment project are analyzed using influence diagram. Using the method of goal-oriented, two layers; general risk representation and concrete risk factors were subdivided, by plotting influence diagrams, the mutual logistic relationship of different kinds of risk factors can be made out clearly, furthermore an efficient and operable risk analysis model based on influence diagram was presented and its operation by a simple example was also illustrated. Risk factors of the project can be estimated by this method from two aspects; qualitative description using graphs and quantitative evaluation by means of probability inference, finally each risk factor and its influence level can be found out visually.
What problem does this paper attempt to address?