The risk assessment of bridge design based on the AHP-FCE model

Yiqiang Xiang,Qiangqiang Wu,Tingting Zhang
2010-01-01
Abstract:As many risks have not been identified and prevented during the design stage of bridges, result in that a lot of accidents and serious events caused by improper design or design fault often occur. In accordance with the basic life circle of bridge design, this paper divided the design risks into four phases: design concept stage, design planning stage, design implementation stage and the design of the ending phase. The evaluation indexes system of bridge design risk is proposed. Based on Analytical Hierarchy Process (AHP), weightings of risk factors are determined. Then the fuzzy evaluation matrix can be get by using Fuzzy Comprehensive Evaluation (FCE). The Zadeh operator can be used to calculate the risk probability and risk loss values for the design risks of the bridge. As an example of engineering application, the risk level and grade of the bridge design are evaluated by the proposal AHP-FCE method according to practical condition of the Ling River Bridge design. The results show the presented method can effectively analyze and assess the bridge design risk.
What problem does this paper attempt to address?