Abstract:This paper introduces a mid-long term optimized operations system for cascaded hydropower plants,which is based on three-layer browse/server/database framework and uses Internet and database technologies.The object of design and development of this system,system’s structure and function,working environment,key technologies,normalization and standardization design are emphasized.A computer’s software that is advanced,suitable,reliable and friend-user interface is developed by using Web Service and ASP.NET.The software has been applied in many cascaded hydropower plants and the results are satisfactory.