Application of Multi-Channel Electrical Method in Investigation of Hydraulic Channels in Qiu Jia Wan Main Dike of the Yangtze River, China
Yixian Xu,Jianghai Xia
DOI: https://doi.org/10.3997/2214-4609-pdb.183.165
2005-01-01
Abstract:Qiu Jia Wan, the main dike of the Yangtze River in Jia Yu County, Hubei Province,China, is a section scheduled for reconstruction due to underground water leakage. Prior to thereconstruction, the paths of water movement (sand layers or local bodies) and their coveringmaterial must clearly be investigated. The traditional methods, e.g. borehole drilling, areexpensive and may re-damage the dike, so the noninvasive multi-channel electrical method waschosen to perform the investigation. One surveying profile parallel to and other three profilesperpendicular to the main dike were carried out in the Qiu Jia Wan section. Acquired data wereinverted by a two-dimensional inversion method. Our interpretation was able to relate anomaliesin resistivity cross sections to water leakage through a sand and gravel layer from the YangtzeRiver to the back of the dike. The results were consistent with hydro-geological analysis andtherefore supplied basic data for the reconstruction task.
What problem does this paper attempt to address?