A Novel Unit Maintenance Strategy of GENCO in Power Market
FENG Chang-you,WANG Xi-fan,WANG Jian-xue,ZHANG Qin,LIU Zhu
DOI: https://doi.org/10.3321/j.issn:0258-8013.2008.13.017
2008-01-01
Abstract:A new strategy for unit maintenance of generating company(GENCO) in power market is presented,based on single-unit flexible maintenance model.Aiming at multi-output state,two economic indices are designated to assess whether unit should be outage for maintenance.One index is Loss,illustrating unit economic loss for maintenance,the other is Loss,P,illustrating unit risk loss for continued operation.The optimal maintenance time and maintenance interval can be got through comparison of Loss and Loss,P.For all units in GENCO,according to their expected economic losses—ELoss,a scheduled maintenance sequence can be acquired.Based on single-unit flexible maintenance model and scheduled sequence,all units in GENCO can be scheduled outage for maintenance.This new maintenance strategy,which is not based on fixed interval,can ensure economic benefit of GENCO as independent economic entity,and guarantee units operating safely and economically.At last,a simple case is used to testify the validity and rationality of this model.