Research on dynamic scheduling approach of construction machinery group based on layered fuzzy logic

Chen Yujun,Wang Jiaxin,Jia Peifa,Xu Hua,Yang Zehong,Zhao Yannan
DOI: https://doi.org/10.3321/j.issn:1002-0470.2005.09.011
2005-01-01
Abstract:In this paper, a layered dynamic scheduling method is presented based on Zadah fuzzy logic mathematical theory and decision fusion. Compared with the conventional fuzzy control method, this method has the advantage of easy modeling and good expansibility. In addition it can avoid the rule explosion problem. This method has been applied to a practical construction machinery dynamic scheduling system, which is simulated according to the production process. Rationality and validity of the approach is validated by simulation and scheduling examples. This approach provides a technical framework for systems similar to construction machinery group system.
What problem does this paper attempt to address?