Use of PSA in the risk-informed design and licensing for the HTR-PM in China

JieJuan Tong,Xuhong He,Dazhi Xue
2005-01-01
Abstract:The paper presents the recent development status of HTR-10 and HTR-PM (the HTR demonstration project in China, which has been initiated in the late of 2004). The role of PSA in the design and licensing of HTR-PM is explained in this paper, mainly supporting to specify the top level regulatory criteria for HTR, identifying licensing basis events including dominant beyond-design basis events further evaluated within the severe accident management framework, and identifying the dominant accident sequences as well as the radioactivity source terms and possible release paths to provide input to the emergency planning specifications, etc. HTR-PM PSA is carried out in an interactive manner with the reactor design work. Some important issues (technical and regulatory) shall be solved. The paper presents some of the ongoing discussions, such as probabilistic safety criteria and primary initiating events list.
What problem does this paper attempt to address?