LIFE CYCLE ASSESSMENT OF A 4MWe BIOMASS INTEGRATED GASIFICATION GAS ENGINES-STEAM TURBINE COMBINED CYCLES POWER PLANT

贾友见,余志,吴创之
DOI: https://doi.org/10.3321/j.issn:0254-0096.2004.01.012
2004-01-01
Abstract:A life cycle assessment study was conducted to a 4MWe BIG/GE-STCC (gas engines-steam turbine combined-cycle) power plant being under development in China. The fact was taken into account that straws collected from fields results in nutrient loss, which should be supplemented by equivalent chemical fertilizers. Four subsystems, namely nutrient loss supplement, biomass fuel transportation, energy conversion process and power plant construction and demolition, were considered. A comparison of the environmental performance of the system with that of the gasification based coal power plant was presented.