Research on prestress stretching control of a large-span truss string structure

李维滨,施骏,郭正兴
DOI: https://doi.org/10.3321/j.issn:1001-0505.2003.05.012
2003-01-01
Abstract:Cable prestress is simulated with a jack and realized by increasing its temperature through finite program ANSYS. An available method of truss-string structure prestress decisions is put forward. The jack temperature load calculated from the serviceability state is applied to the model of the construction state, thus the cable stress and controlling point displacement may be presented by analysis. The stretching influence on the near trusses should be considered when using the stretching-twice method, and the construction is hard to be controlled. The Harbin exhibition sports center with a 128 m support span, attached to a deep design calculation of the super-large span prestress truss string structure, stretching once in tension bed method is brought forward for the bottom cable of the single truss string structure. From calculation research on the friction force between the tension bed and the truss string structure, the friction influence is considered for the displacement method of the middle of span, with the action of the fixed cable stress. This method, with vertical displacement of the middle of span as its main control target for prestress stretching, is successfully applied in the prestress stretching construction of the project.
What problem does this paper attempt to address?