Time and Cost-Based Analysis of Dynamic Collaboration Construction

蒋贵川,范玉顺,吴澄
DOI: https://doi.org/10.3321/j.issn:1000-0054.2002.03.029
2002-01-01
Abstract:This paper analyzes the consistency between the evaluation indicator for an enterprise's agility proposed by Rick Dove and the enterprise's income. The general problems of process decomposition and bid based dynamic collaboration construction are then analyzed using a time and cost evaluating indicator of agility. Some factors affecting the time and cost of dynamic collaboration construction are analyzed and the specific steps are given for the dynamic collaboration construction. The evolution of dynamic collaboration and its application to Chinese enterprises are analyzed.
What problem does this paper attempt to address?