Operation experience of CYCIAE30 injector

C.M. Chu,Tianjue Zhang,Mingwu Fan
DOI: https://doi.org/10.1109/pac.1999.794321
2003-01-01
Abstract:A 30 MeV compact cyclotron, CYCIAE30 has been working as a supplier of medium and short live time radioactive isotopes for more than four years. To meet the increasing requirements of medical isotopes, it is asked that the machine should continuously run at a high level of beam intensity. But last September, it was difficulty to get the beam more than 100 /spl mu/A. Some troubles came from the injector were found in the injection system. In this paper, the injection system and the existing problem will be described briefly and the proposal to improve the injection system is given.
What problem does this paper attempt to address?