Calculation and Distribution of Vertical Differential Settlement in Immersed Tunnels

Gang Wei,Xinguang Zhu,Qinwei Shu
DOI: https://doi.org/10.3969/j.issn.1009-6582.2013.06.010
2013-01-01
Abstract:In this paper, the elastic foundation beam method currently used in the vertical settlement calculation for immersed tunnels is modified, the restricted method of semi-flexible and semi-rigid joints is improved, the calculation of foundation elastic resistance coefficient K is put forward, the settlement calculation for sand foundations is established, and a soil mass rebound modulus is proposed to calculate foundation settlements. Using the construction of the Shengjiamengang immersed tunnel in Zhoushan of the Zhejiang Province as an example, the vertical settlements of an immersed tunnel under normal conditions and limited conditions were calculated respectively. The results show that: the given method can reflect well the effects of an uneven soil layer, uneven siltation, and different joint forms on the vertical settlement of immersed tunnels; the calculated results are close to the measured ones; for the Shengjiamengang subsea tunnel, the settlement in the foundation is relatively large, being more than 50% of the total settlements; and different joint forms at both ends have great influence on the vertical settlement distribution of immersed tunnels.
What problem does this paper attempt to address?