Field investigation on the pile-soil-anchor behavior due to excavation-induced soil movement

Hang Lin,Tingyu Wu
2013-01-01
Abstract:Pile-anchor structure has been widely used in reinforcing foundation pit against the excavation-induced soil movement. Pile-soil-anchor interaction is indeed a complex problem. In order to make sure the surrounding soil is stable, the field monitoring method has been employed, which proved to be an effective investigation method. This paper takes a largescale pile-anchor supported foundation excavation as engineering background, and carries out a series of filed monitoring analysis during construction. The field investigation covers a large area of foundation pit and lasts a long time along construction period, with 405 days from the beginning of excavation to the completion of the basement, in which 165 days were spent for the excavation, and 240 days for the anchor-piles and the basement construction. Investigations on various parameters of the supporting structure are carried out, including the stress in anchor bars, the deformation of pile structure, the pressure and the deformation of the surrounding soil, and the pore water pressure. © 2013, EJGE.
What problem does this paper attempt to address?