Joint Design and Operation of Flood Limited Water Levels for Qingjiang Cascade Reservoirs

刘攀,郭生练,栗飞,陈炯宏,李雨
2012-01-01
Abstract:A joint design and operation model of flood limited water levels is proposed and discussed in this paper for efficient use of flood water resources by cascade reservoirs. This model satisfies the requirement that the designed operation has no impact on the flood control standards of the Qingjiang basin, nor impact on these reservoirs' role in the Yangtze River flood control system. By using the data of daily rainfall and runoff of the basin in the period of 1951 - 2009, the results show that if the flood limited water levels of the Shuibuya and Geheyan reservoirs are fixed at 387.5m and 196.0m, respectively, then they can generate more power of 0. 021 billion kW. h or an 0. 302% increase in the annual average output relative to the existing operation. Thus, joint design can greatly increase reservoirs' comprehensive benefits, particularly, in normal and dry years.
What problem does this paper attempt to address?