Production Planning with Postponement Strategy Based on Classification of Product Differentiations.

Ying Lu,Peng Jing
DOI: https://doi.org/10.4304/jsw.8.9.2253-2261
2013-01-01
Abstract:This paper was motivated by the practices of some Chinese automobile manufacturers who had changed their production planning processes in order to obtain more demand information. We regard their method s as an example of postponement implementation in production planning and name it as production planning postponement (PPP). F irst ly, by treat ing PPP as a two-level hierarchical structure problem which is characterized by families and items w e develop an analytical model for evaluating the value of this kind of postponement. Secondly, we propose an algorithm based on generalized linear programming for solving the model . Then we illustrate the effectiveness of PPP by using a numerical example and discuss the impact of prediction accuracy on the performance of PPP. The results of a numerical example show that if the demand is overestimated at initial time PPP can perform quite well. Finally , we set future research directions on PPP suggested by our results.
What problem does this paper attempt to address?