Case study on settlement around an unexcavated foundation pit due to groundwater pumping

SUN Wen-juan,SHEN Shui-long,LI Yao-liang,TANG Cui-ping
2008-01-01
Abstract:During the dry excavation of deep foundation pit,groundwater must be pumped in or around the pit,and the seepage of groundwater forms a groundwater level depression cone around the pit.The drawdown of the groundwater level will cause the increase of effective stress of soft soil.Thus,the soft clay will consolidate and settlement will occur in or around the pit.A case history on the settlement in and around an unexcavated pit due to groundwater pumping was presented.Before excavation the groundwater was pumped for 260 days,and about 0.20~0.30 m-settlement in the pit was observed.Settlement was also observed around the pit.In order to analyze the variation of groundwater level,seepage in the subsoil,and ground surface settlement,a 3D finite element model was adopted.The analytical results indicate that by using the geotechnical parameters the proposed method can simulate the field measured values well.Further analysis shows that the settlement is mainly induced by the compression of aquitard I.
What problem does this paper attempt to address?