In-Situ Monitoring Method for Frozen Soil Pressure During Cross Passage Construction by Freezing Method

Lin Ping,Ye Guan-lin,Chen Nan,Wang Jian-hua,Hashimoto Tadashi
DOI: https://doi.org/10.3969/j.issn.1000-7598.2011.08.051
2011-01-01
Abstract:Artificial freezing method is widely used in construction of cross passage for shield tunnel, while due to lack of measurement data, no clear rule for determining frost-heave force is given for tunnel design. Based on the Shanghai Yangtze River Tunnel project, a careful in-situ monitoring is carried out by utilizing a new type earth pressure gauge. Firstly, the main characteristics of PAD type earth pressure gauge and the installation method are introduced. Secondly, the automatic data collection system and the layout of measuring points are described. Aforementioned efforts successfully protect all 5 gauges, and valid data are obtained. The data show that the maximum measured frost-heave force is much smaller than the prediction. It is due to the countermeasure of pressure release hole, which reduced the frost-heave pressure on segment.
What problem does this paper attempt to address?